Skip to content

How the system works, and the record it keeps.

Our current research, the evidence so far and three ways to work with us. Detailed design discussions begin with a scoped research question.

What we are testing

Can AI search whole reactor designs faster, while physics decides and each claim keeps its evidence? We are testing that question in software and simulation.

How designs move through the system
  1. Design

    Our models explore options for a focused reactor-design question within engineering constraints.

  2. Test

    Candidates that clear the engineering limits are checked with reactor physics. Independent benchmarking is a next step.

  3. Trace

    Each number in a claim stays bound to its supporting record. Assumptions and gaps remain visible.

Readiness, part by part

No component has been independently validated yet. Independent review is one of our next research asks.

As of 4 Nov 2026

  1. Design engine

    Proposes reactor designs and checks them with physics.

    Stage: Computational proof of concept

    So far
    Over 9,000 physics runs, counting the Energy Lab pilot, each recorded in our design ledgers.
    Next
    Independent benchmarking of its learned models.
  2. Evidence engine

    Binds each number in a claim to the record behind it.

    Stage: Working prototype on a demo case

    So far
    One demo case: 8 claims and 6 declared gaps. The draft check passes; release is refused.
    Next
    Cases that pass release on full-detail runs, reviewed by people who write safety cases.
  3. Bench control and safety software

    Runs the bench rig's start-ups, faults and trips.

    Stage: Tested in simulation

    So far
    Over 500 automated tests of the bench software and its simulator, with separate adversarial testing.
    Next
    Run on the bench rig itself.
  4. Bench rig

    Designed so electric heaters stand in for fuel, at a few watts per pin.

    Stage: Designed in CAD, next to build

    So far
    The design: three heated pins in a 3D-printed core, at 48 V DC or less, with no radioactive material.
    Next
    Build and instrument it, and compare its measurements with the simulator.

The bench rig: a reactor's control problem, at a few watts.

The CAD design uses electric heaters and a reactor physics model to rehearse start-ups, faults and trips. Its control and safety software is tested against a simulator.

Explore the rig design and safety controls
Design visualisation of the bench rig: an aluminium guard frame with clear side panels on a wooden base, three copper-coloured printed core cassettes on a blue sample changer at the centre, a blower and duct at the left, a control panel of boards behind and a rod tower at the right. Design visualisation
Bench rig 4 Nov 2026 Design visualisation

The design

The rig as drawn in CAD, and the software tested against its simulator.

Supply
Designed for 48 V DC or less. Electric heaters stand in for fuel, with no radioactive material.
Trip
Designed with independent, fail-safe trips, so a fault or a loss of power ends in a safe shutdown.
Permit
Only a person can throw the permit switch. In our software, the AI can plan runs but cannot override it.
Record
In simulation, every run is written to a ledger.
Adversarial testing
Separately from the test suite, an automated adversary attacks the safety software in simulation.
After a trip
In simulation, decay heat stays bounded, all motion is locked out and the fan keeps cooling.

One claim, with its working.

What it shows: the system will not release a claim until the physics behind it is good enough to stand on.

Produced on 4 Oct 2026: the values, their status and uncertainty, the record behind them and the declared gaps. A complete trail is not a safety finding; people and the regulator decide that.

Claim C1 of 8, reactivity control 4 Oct 2026 From our ledger

Cold beginning-of-life multiplication is 1.074985 ± 0.0028;
cold excess is 6,975.5 pcm,
with control holddown residual −24.5 pcm.

A person writes the sentence. Every value in it is filled in from the record, never typed.

Values in claim C1, with status and uncertainty
ValueFigureStatusUncertainty
Multiplication factor, cold, beginning of life 1.074985 Computed ± 0.0028
Cold excess reactivity 6,975.5 pcm Derived None stated
Control holddown residual −24.5 pcm Derived None stated

Computed: from a physics run.Derived: from a model and stated assumptions. pcm (per cent mille) is one hundred-thousandth, the usual unit for small changes in reactivity.

The residual is how far cold excess sits from the planning allowance for what the control system must hold down; negative means inside it. It is not a shutdown margin: that evidence is one of the declared gaps.

Bound to record edcc6cd2…f22c, from a screening run of Monte Carlo reactor physics. Uncertainty is shown where the record states one.

Draft check
Passed
Release
Refused: Rests on screening runs, not full-detail ones
Evidence gaps
6 declared, by safety principle:
  • Reactivity control
  • Heat removal
  • Containment and shielding
  • Fuel integrity
  • Security and safeguards
  • Inherent safety

Technical note: binding a claim to its evidence

Work with us

Choose a focused design study, an evidence evaluation or an independent validation project. These are proposed research collaborations, with scope agreed before work begins.

Start with a scoping conversation. We agree the question, deliverables, responsibilities and review point before a project begins.

Reactor developers

Design studies

Bring a focused reactor-design question. We can discuss a research study that compares candidates against agreed constraints and physics checks.

Proposed output

A scoped study brief, a comparison of the agreed candidates and a record of the assumptions and limitations.

Discuss a design study

Engineering and safety-case teams

Evidence evaluations

Choose a worked problem and assess how our prototype connects engineering claims to supporting records.

Proposed output

A worked evidence case and a review of what it captures, what it misses and where expert judgement is still needed.

Discuss an evidence evaluation

Research groups and funders

Independent validation

Help independently benchmark our models, or scope a study comparing the planned bench with its simulator.

Proposed output

An agreed test plan, a comparison of results and a written account of the limitations. Physical bench work requires the rig to be built and instrumented first.

Discuss a validation project

Send the question you want to explore: hello@hexi.industries

Development log

Dated from our records. When a result doesn't hold up, it stays in the log, marked withdrawn.

  1. Adversarial testing rebuilt. It found two defects, both fixed the same day.

    Both were cases the safety software should have refused before a run, and both ended in a safe trip. Both are now refused before a run starts, and the full test suite passes.

  2. First adversarial test run: zero failures in 199 scenarios.Withdrawn

    A review then showed the test could not observe the software safety layer, so the result said nothing about the software. We withdrew it and rebuilt the test.

  3. Bench software started.

    A simulator of the bench rig, its safety controller, and the interface our AI uses to plan runs.

  4. Direction set: AI that designs nuclear reactors.

    AI for fission reactor design, checked with physics and backed by traceable evidence.

  5. First full-detail runs.

    Our most promising designs examined again, in depth, with Monte Carlo reactor physics.

  6. Evidence engine, and its first demo case.

    The case holds 8 claims and declares 6 gaps. The draft check passes; release is refused because the claims rest on screening runs. Its first claim is shown above.

  7. Design engine and ledger.

    Designs that clear the engineering limits are scored with Monte Carlo reactor physics, and every result is appended to a hash-chained ledger.

Security and responsible research

People review and approve.
Our AI proposes designs and plans bench runs. A person reviews the results and approves what we publish.
Our AI can plan, not arm.
In our bench software, the AI can plan a run, but only a person can throw the permit switch, and the AI cannot override it.
Simulations and renders are labelled.
Each one says so where it appears. Nothing on this site is a measurement unless it says so.
Summaries public, design detail private.
We publish results, methods in outline and worked examples. Design detail, settings and code stay private, under a written disclosure rule that automated checks enforce on this site.
Corrections stay visible.
When a result doesn't hold up, we withdraw it and keep it in the log, marked withdrawn.

Questions about how we handle any of this: hello@hexi.industries.

Questions

Is the bench nuclear?

No. The planned rig uses electric heaters at 48 V or less, with no radioactive material. A reactor physics model sets heater power so we can investigate control behaviour without a nuclear reaction.

Does the evidence engine replace a safety case?

No. It keeps every number in a claim honest and traceable. People still write, review and judge the safety case, and a regulator decides.

Why publish the working but not the method in detail?

We share what a reviewer needs to judge a result: the claim, its source, its status and its gaps. The details of how our system searches are our own.

How can we work together?

Choose a design study, evidence evaluation or validation project in Work with us. Email the question you want to explore; we agree the scope, outputs and review point before a project begins.

Who is behind Hexi?

Hexi Industries Ltd, a UK veteran-founded company registered in England and Wales, with roots in the Royal Marines, AI labs and engineering. The About page has more.

Bring a focused question.

Reactor developers, engineering teams, research groups and funders: let’s define a useful study and how to judge its results.